A. A locality shall not require zoning approval for (i) routine maintenance or (ii) the replacement of wireless facilities or wireless support structures within a six-foot perimeter with wireless facilities or wireless support structures that are substantially similar or the same size or smaller. However, a locality may require a permit to work within the right-of-way for the activities described in clause (i) or (ii), if applicable. B. Nothing in this article shall prohibit a locality from limiting the number of new structures or the number of wireless facilities that can be installed in a specific location. 2018, cc. 835 , 835 .
|
|